Quality Assurance System
Quality inspection in machining applications represent a critical phase, ensuring every finished component meets the high standards of precision and excellence. Quality assurance hold the key to maintaining high standards in Boyi custom machining parts. They prevent defects, ensure customer satisfaction, and maintain the reliability of the manufacturing process. Boyi quality inspection team will be checking each finished parts ensure each parts deliveried cusotmers hand is perfect.
Quality Reports and Certifications
Our professional quality inspection personnel can correctly select the appropriate inspection equipment to inspect parts. Boyi can provide customers with full-size inspection reports and corresponding material certifications and surface treatment reports.
Full Dimensions Check Report
Dimensions are verified using a
precision measuring instrument
(caliper or gauge) and with a CMM
when required. The report includes:
- Quantity of parts
- Critical dimensions
- Threads and tolerances
- Thicknesses and depths
- Part appearance
Material Certification
we can provide the certification of
the material used in the manufacturing
process.The report comes from the
raw material manufacturer and usually includes:
- Material heat number
- Material grade
- Mechanical properties
- Chemical analysis
- Heat treatment (if applicable)
Download Report & Certifications
Here you can view our full size quality inspection report sample, and other raw material certification, surface treatment certification etc.
Resolving Quality Issues
Our number one priority at Boyi precision is delivering high-quality parts that meet customer requirements. If your order is not up to this standard and fails to meet specifications, please send our sales more details and we will resolve the problem rapidly, within 1-3 business days.
Free Re-production and Delivery
- Unacceptable processing defects
- Fail to meet tolerance requirement
- Incorrect material/finished
Refund Money
- The part is not machinable
- The customer does not agree to rework
- Other reasons